Guangdong, China
Business Type:
Manufacturer/Factory & Trading Company
Year of Establishment:
2011-07-28
Number of Employees:
53
Address:
No. 13 Industry Road, Hengliu Area, Shatian Town, Dongguan, Guangdong, China
OEM/ODM Service
Sample Available
Secured Trading Service
Rating:
4.8/5

Patches, Badges, Woven Labels manufacturer / supplier in China, offering Custom Printing Cardboard Mattress Corner Packaging Mattress Edge Protector Mattress Paper Corner Wrapping, Paper Wrapped Corner Protectors Paper Quality Mattress Corners Protector, Custom Design Mattress Corner Guards Mattress Soft Plastic Plate with Logo Corner Guard for Bed Base and so on.

Gold Member Since 2010

Suppliers with verified business licenses

Others Shoe Lace

Total 4 Others Shoe Lace Products

LED Flashing Shoelace Tipping Film Belt

FOB Price: US $0.05-0.5 / Piece
Min. Order: 200 Pieces
Item: LED Flashing Shoelace Tipping Film Belt
Size: Adult:115cm*1cm Child:80cm*1cm
MOQ: 200
Packing Way: 50pair/Bundle, 2000pair/CTN
Sample Time: 5-7 Days for Samples
Production Time: 10-15 Days for Production

Child Silicone Light up LED Shoelace Stopper

FOB Price: US $0.05-0.5 / Pair
Min. Order: 500 Pairs
Color: Mixed Color
Material: Plastic
Item: Child Silicone Light up LED Shoelace Stopper
Size: Adult:115cm(45inch) Child:80cm(31.5inch)
Width: 7-10mm for Flat Shoelace, 2-4mm for Round Shoelace
Logo: Silkscreen Printing, Heat Transfer, Woven on Lace

Custom Promotional Flashing LED Shoelace

FOB Price: US $0.05-0.5 / Pair
Min. Order: 500 Pairs
Item: Custom Promotional Flashing LED Shoelace
Size: Adult:115cm(45inch) Child:80cm(31.5inch)
Width: 7-10mm for Flat Shoelace, 2-4mm for Round Shoelace
Logo: Silkscreen Printing, Heat Transfer, Woven on Lace
Tips: Metal Tips, Plastic Tips
Sample Time: 3-4 Days for Sample

Different Size No Tie Shoe Silicone Upgrade Adults Shoelace

FOB Price: US $0.05-0.5 / Piece
Min. Order: 200 Pieces
Item: LED Flashing Shoelace Tipping Film Belt
Size: Adult:115cm*1cm Child:80cm*1cm
MOQ: 200
Packing Way: 50pair/Bundle, 2000pair/CTN
Sample Time: 5-7 Days for Samples
Production Time: 10-15 Days for Production